buses: 101 (smaller) “midibuses”, 638 standard type, 538 “articulated” (multi-unit)
trolleybuses: 35 “articulated” (multi-unit), 2 standard type
Vehicles - low-floor (percent of fleet)
trams: 426 vehicles (54 %)
buses: 1,277 vehicles (100 %, except retro buses)
trolleybuses: 37 vehicles (100 %)
DPP – Number of Routes
Trams
Buses
Metro
Trolleybuses
Totals
36
154
3
2
Daily Routes - Longest
Trams: Route (line) 26 between Dědina – Nádraží Hostivař, meters traveled = 22,507 (without loops), average completion time = 68,5 minutes; route (line) 12 between Sídliště Barrandov – Lehovec, meters traveled = 22,858 (without loops), average completion time = 67,5 minutes.
City Buses: Route (line) 177 between Poliklinika Mazurská – Chodov, meters traveled = 27,850, average completion time = 75 minutes.
Suburban Buses: Route (line) 366 between Depo Hostivař – Mukařov, meters traveled = 28,625, average completion time = 57 minutes.
Metro: Line B between Černý Most – Zličín, meters traveled = 25,706, average completion time = 41 minutes.
Daily Routes - Shortest
Trams: Route (line) 13 between Čechovo náměstí – Olšanské hřbitovy, meters traveled = 5,287 (without loops), average completion time = 18,5 minutes.
City Buses: Route (line) 249 between Nový Zličín – Zličín, meters traveled = 650, average completion time = 3 minutes.
Suburban Buses: Route (line) 352 between Luka – Jinočany, náměstí, meters traveled = 7,225, average completion time = 20 minutes.
Metro: Line A between Nemocnice Motol – Depo Hostivař, meters traveled = 16,957, average completion time = 31 minutes.
Number of Employees
The Prague Public Transit Company (DPP) has 11,362 employees, of which 9,683 are men and 1,679 are women. Percentage-wise, the largest numbers of employees work as vehicle drivers (39.8 %), next come technical and administrative positions (28.6 %) and finally a range of manual occupations (27,4 %).
Note: all data as of 31 December 2024.
Timetables
Jízdní řád pro požadovanou linku není momentálně dostupný.